Originally Posted by
Jim Dwight
My comment is on the electrical. I don't know what is allowed where you live but I have done the electrical finish (and plumbing and carpentry) on two major remodels on my house. In my shop, I just had them run the circuits to the room and then I put in all the outlets and hooked them up. Putting in outlets is a piece of cake. I have never done a sub-panel, however, and probably never will. The first remodel I hooked up the heat pump. I put in the light fixtures for both. The rough in included running the wires (in the areas other than the shop and my wife's office which I also rough wired).
Depends on how you want to spend your time but if you want to save money, at least installing the outlets and light fixtures would probably save you significantly and be something you could easily handle.