Well we got back from 2 weeks vacation and went out to the homestead to have a look at the pad. It looks good, but the dump trucks did a job on the driveway, it's pretty torn up. I wish my contractor had told me it was that wet still, we could have waited a little for it to dry up.
Here's some pictures below. It is 85x55 in size and goes from 4 inch elevation on the uphill side to 22 inches on the downhill side. It's made from shale and is good and level.
Attachment 361614Attachment 361615Attachment 361616Attachment 361617
Our build date has been pushed back to 6/26 due to the very wet spring we've had. The builder is behind due to it and that's ok with me, it will allow things to dry out on our land a bit more, which is a good thing.