As you can see from the pics in this thread www.sawmillcreek.org/showthread.php?t=108682,
my DC run will start at the middle of the window. Most everyone runs the ducting to the ceiling and then to where they need it. I am wondering if I should run the duct to the ceiling first, or could I drop down to the floor and go that way? If I can arrange things so that all the ducting will be on the pictured wall, I am wondering if it makes a difference WHERE the vertical rises are?
The OH door hardware precludes any drops in half of the garage (sorry, SHOP!), so I plan to try to keep most of the ducting along the wall you see. I still need to figure out how to deal with the TS, as well as the CMS that is used on the table under the red tool box in the foreground. I could drop a 4"max pipe between the OH doors for the TS. There is only about 5" between the OH door tracks.
I guess what I am asking is; Does it matter where the vertical rise is for the DC? If I use my Delta single stage DC for the TS, I could keep the cyclone ducting along the one wall.
Suggestions?
note: I'm still arranging things, so the only thing that HAS to be where it is is the DC.