I have a pole building scheduled to go up in Aug (temp living quarters and shop). The concrete floor will be 40 x 70 ft. I am thinking it might be a good idea to have power outlets running down the center of the floor.
Is there a standard spacing for this?
Would it be better to drop power from the ceiling? (14 ft)
Would the outlets make it difficult to level the concrete?

Pros and Cons?