I'm getting ready to plumb the shop (finally) for dust collection and I know I should run 6" as far as I can, BUT, I'm thinking 4" is enough for this tool. If I turn it on it will blow up the single stage Delta I have without the Delta even on! I'm thinking the chip blower will provide adequate force in conjunction with a 4" flex to get everything into the mainstream 6" ducting to the cyclone.
Your thoughts....