Results 1 to 7 of 7

Thread: Basement Workshop With Steep Pitch

  1. #1
    Join Date
    Feb 2011
    Location
    Milwaukee, Wi
    Posts
    7

    Basement Workshop With Steep Pitch

    I am setting up a shop in an old house with a fairly good pitch on the floor towards the drain. Am just curious as to how others deal with this and maybe get some useful tips and what to avoid.

  2. #2
    Join Date
    Aug 2006
    Location
    St. Louis, MO
    Posts
    172
    Mine is just like that. Only suggestion is lots of shims. My workbench is 76" long and the left legs are 3/4" longer than the right.

  3. #3
    Join Date
    Jun 2006
    Location
    The Hartland of Michigan
    Posts
    7,628
    You could always build a floor on top of it. Rip 2x4s as needed to level it, fasten them to the present floor, then put a plywood layer on top of it.
    That will shorten the distance to the ceiling, but I've heard of people doing it. You could run electric at the same time.
    Never, under any circumstances, consume a laxative and sleeping pill, on the same night

  4. #4
    Join Date
    May 2009
    Location
    Boston
    Posts
    1,740
    Use adjustable feet on your benches. Woodcraft or Rockler have some in there catalogs that seem a little more heavy duty than the stuff at HD.

  5. #5
    Join Date
    Feb 2010
    Location
    Collegeville PA (30 min west of Philly)
    Posts
    1,143
    Blog Entries
    1
    I just leveled my old farmhouse kitchen floor just as Myk describes it above. Set a 2x4 from edge to edge in your room, set a compass to the width of the 2x4, scribe the contour of the floor onto the 2x4, cut the 2x4, fasten the 2x4 to the floor. Repeat every 16 inches, top with 3/4" subfloor. We went from a floor that would scatter spilled marbles, to a flat, level floor in one day (one really really hard day).
    - Bob R.
    Collegeville PA (30 minutes west of Philly)

  6. #6
    Quote Originally Posted by Myk Rian View Post
    You could always build a floor on top of it. Rip 2x4s as needed to level it, fasten them to the present floor, then put a plywood layer on top of it.
    That will shorten the distance to the ceiling, but I've heard of people doing it. You could run electric at the same time.
    I would also put heavy plastic sheet down first to stop moisture coming thru the concrete
    insulate with rigid foam between the sleepers
    just some more info
    http://www.buildingscience.com/docum..._download/file

  7. #7
    Adjustable feet levelers. I wouldn't build a floor, since in an 'old' house yr likely going to be height challenged to begin with. Even if the floor were level, adjustable feet is a nice to have anyway.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •