Page 2 of 2 FirstFirst 12
Results 16 to 21 of 21

Thread: Level a new workbench

  1. #16
    Join Date
    Sep 2009
    Location
    Conway, Arkansas
    Posts
    608
    Quote Originally Posted by Alan Schaffter View Post
    Level? Level only matters when building houses. You want it flat and supported so it doesn't rock (shims, wedges, etc.) but there is no need to level it. Put a level on your machines, they are probably not level if they are sitting in a garage.
    Level isn't important but it sounds like the bench is wobbling because the legs aren't all touching the ground. If he can fix that and get level at the same time why not?

    I'd go with the shims with brads approach or adjustable feet with rubber pads. That way if you ever move it to a new location re-shimming is pretty easy and it won't slide around on you.
    One purchase helps keep HF in business, the other helps keep LV in business.
    Those two outcomes have different values for me. - Chuck Nickerson

  2. #17
    Join Date
    Mar 2006
    Location
    SoCal
    Posts
    22,512
    Blog Entries
    1
    I just stuck a strip of blue painter's tape across them and marked the positions a few years ago expecting to fix up something permanent later. Never has moved. A blob of construction adhesive should hold it and be removable later if required(?).
    "A hen is only an egg's way of making another egg".


    – Samuel Butler

  3. #18
    Join Date
    Feb 2009
    Location
    Cedar Park, TX - Boulder Creek, CA
    Posts
    840
    "Level? Level only matters when building houses."

    From what I've seen, not according to the guy who built mine.

  4. #19
    Join Date
    Jan 2010
    Location
    Tampa Bay, FL
    Posts
    3,928
    Quote Originally Posted by Wes Grass View Post
    "Level? Level only matters when building houses."

    From what I've seen, not according to the guy who built mine.
    True, dat.

  5. #20
    Join Date
    Sep 2009
    Location
    Conway, Arkansas
    Posts
    608
    Quote Originally Posted by glenn bradley View Post
    I just stuck a strip of blue painter's tape across them and marked the positions a few years ago expecting to fix up something permanent later. Never has moved. A blob of construction adhesive should hold it and be removable later if required(?).
    Yep, if it hasn't moved in years glue that bad boy down
    One purchase helps keep HF in business, the other helps keep LV in business.
    Those two outcomes have different values for me. - Chuck Nickerson

  6. #21
    Quote Originally Posted by David Giles View Post
    If it were my bench, I would think about drilling a hole in the floor, epoxy a 1/2" all-thread into the hole with 2" extending above the floor. Add a nut and washer to the all-thread. Drill a hole in the bench foot. Set the foot onto the nut/washer. Level the bench. Do the same for 2 of the other three legs.

    I would think about this plan of action for 2-3 days. Then I would shim it.
    LOL , Really made me laugh out loud, at myself as much as anything

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •