Results 1 to 3 of 3

Thread: sea turtle display part3 final

  1. #1

    sea turtle display part3 final

    Sea turtles swimming -part 3 completion.
    It took 5 hrs cnc time for the *.stl files on the turtles,then it was 9 hrs shop time for the base prep
    driftwood cutting ,sanding ,laquering and final assembly
    It looks good and feels smooth,i used 5.5 board feet of 4/4 black walnut
    Even the base was a chore as i had a 22in diameter piece but only half and it was a wedge cut
    so i re-sawed it and laminated it together and its 1.25 thick with 4 biscuits down the centre
    thats why its more oval than round


    http://youtu.be/s4OVJfhOiOM assembled sea turtles 345 degree view
    Attached Images Attached Images
    Last edited by stan kern; 11-04-2014 at 7:10 PM. Reason: wrong photos

  2. #2
    Love it, Stan. Really nice work!
    Live Oak Forge
    40W Epilog Mini 18
    Shopbot 32"x24"x6" PRT
    Shopbot 48"x48"x6" PRS
    Next Engine Scanner
    Artcam
    CorelDRAW X5
    Multiple and various other implements of destruction

  3. #3
    thanks a lot

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •