It's been a long hot summer building this addition on to my shop. I started working on this back in May cutting down a big oak next to my shop and then digging the footings. I had it framed up by the end of July and just finished the exterior last week. I moved inside this weekend and started installing rigid insulation in the rafter bays. With eight foot side walls I want as much head space as possible so there will be no ceiling. I moved the rafter ties up to give about 10' of effective height. I've done all the work myself except for the seamless gutter installation. Soaked many sets of clothes with sweat working on this but I can see the light at the end of the tunnel now.