I will be moving sometime in the near future. That in itself is stressful enough, but moving my (basement) shop scares the hell out of me. Most tools can be broken down into smaller pieces, but how do I get a 500 lb., six foot long jointer up the bulkhead? Getting it down was fairly easy. I built a ramp out of 2 x 6's and slid the crates down the ramp. Should I build a crate for it (less the stand and motor), build another ramp and use a come-along to pull it up out of the basement? I can't be the first person to move a basement shop, so how did you do it?
Dick