Having a 30x40 shop space built next to new house construction. Concrete slab. The building is stick-built but with steel exterior skin and roof, and the contractor is going to spray foam insulation - but only an inch or two. To save some money I will take over after that to run my electrical and finish the walls. I will heat the space with Hot-Dog suspended propane heater, about 65,000 btu. This is in Missouri where we have plenty of subfreezing temps in the winter.
Given a steel skin and a thin coat of foam insulation, I am thinking I should supplement the insulation (foam is very expensive so trying to keep cost down) with fiberglass batts. If I do that, do I need a vapor barrier as well before finishing the walls?