I'm going to be pouring the slab in a month in the 40*60 man cave. About half will be woodshop. I'm still not quiet set on floor plan, but an close. Going to run sch40 pvc conduit under slab. Thought on boxes or general things to consider? Most all equipment out in the center is 220 single or 3 phase, less than 10 hp. Thanks!