February 23rd, 2006
The shingles are going on.
IMG_0694.jpg
The roofer was already there when I got there at 7:15. He was sweeping the dusting of snow off the roof and it wasn't long before he started laying down the shingles. By the time I left at about 3:30 he had almost half of the total roof done.
IMG_0697.jpg IMG_0696.jpg
The pictures were taken around 1 PM. I'm sure he'll finish up tomorrow.
Norm the electrician was back and got closer to finishing his rough in for inspection tomorrow, but other than the roofer he was the only sub today.
Benny and Dan finished up the framing for the tub and then started doing the framing next to the stairs. Benny also reworked the stairs to include the landing. Tomorrow will be Benny and Dan's last day for at least a week. They still have to do whatever is going to happen with the bay window and finish framing in the basement. I also have some blocks for them to put in for towel bars, TP holders, etc. I'm going to miss seeing them every day, but I guess we must move on.
The inspector is scheduled for tomorrow afternoon. His pass of the work so far will mean insulation will go in the walls Monday.
WOW! I'm really starting to realize that it's not that far away.
Thanks for looking.
Karl