I left off yesterday with some shots of the eave I was messing around with. That's now all done. So let's procratinate about windows for one more thread.
42.jpg
The only significant improvement in this shot is that the door has been installed. It may look like an odd location for a door in a church, but remember that the new real church is actually an historical interpretive center. The floor plan indicates that this is actually a service entrance.
43.jpg
And here's a new shot of the eave all done. I left a small corner of it open to demonstrate that there really is stuff happening within the building system of the model. Note too that I installed the shakes on the roof and the associated soffit and fascia. And I got some of the siding installed. Couldn't go all the way across or up because, well, those dang windows aint built yet. That means I can't cut the rough opening and that means that I can't install the wall system over there. In turn that means I can't install the trim ...... Classic chicken and egg dilemma.
44.jpg
Just another shot of the "open side" of the model.
Tomorrow is it. Time to build the windows.