I bought some 5/4 by 6" pressure treated pine decking boards to make a porch swing. It's very wet, straight from the Borg. I would appreciate anyone's input.
- How long do I need to wait before I can start using it on my project? I am most concerned about the 4 ft slats that I will be ripping 5/8 by 1" that I do not want to get all warped.
- If it needs to dry, should I dry it in my basement shop or outside?
- Plans are to use polyurethane finish.