I've been presented with a full set of plans for a 6300+ square foot house and asked to bid ALL the trimwork. Single piece 4¼" Crown, 3¼" casings & window frames, 4½" base, built-ins, cabinet boxes (and install pre-ordered doors and drawer fronts), make drawer boxes, adjustable & fixed shelves, media cabinet boxes, storage cabinet boxes, yada, yada, yada. I've never priced out "bulk" trim like this.

The kicker to this - I would have 4 weeks to do the whole house. I'm thinking I might need ALL my tools insite, and would have to duplicate myself about 6 times.

The General Contrator wants me to bid labor only - he would supply all materials. Everything is paint grade. (In his words - he doesn't want "furniture"!)

Not sure I want this one.

Todd