well guys and gals, i've finally made it back to the computer for a little bit (translation........ i'm able to sit down for 5 minutes) and i've got a pic of my shop progress. as you can see we're almost done with the vinyl and the roof is on. maybe, just maybe this week the garage door guys will be out and i cant start pulling wire and nailing boxes for plugs. i've been pretty delayed in my progress due to the fact that i've been on the framing crew for my parents house, which we started as soon as we were done with the framing here, and holding a full time J O B. i'm dead durn tired, but now i've got my regular days off again......(work 12hr shifts and have 4 days off.........woohoo), until it's time to start mom and dads trim and cabinets, BUT i've gotta wire my shop and pull everything over there to build the cabinets........... i'm confused. lol
as far as mom and dads house, the electical, plumbing, hvac, roof and insulation are done. the brick layers are there now as well as the sheetrock guys.
thanx for looking at the pic and i'm sorry i havent posted for those interested and i look foward to my daily reading on the creek to resume.
cya later
brad