I have a RP doors and drawer face project coming up. I have measured and determined that I will need about 50 BF to do the job. If the boards are say..a little above average in quality, what would be a fair amount to buy extra to account for minor mistakes and not being able to use certain parts of the board. I was thinking if I need 50 buy 65??
Thanks
Johnny