Hopefully somebody can help me out with a little dust collector piping issue I am having. I am upgrading my dust collector and in doing so have to move it from its current location. I can easily pipe to all my machines except my jointer. My jointer has the port on the outfeed side and my dust collector is located about 20 feet behind it. The jointer is located about a foot from the wall in which the main run will be located. The jointer is the last machine that will be connected to that run. How do I make the 180 bend that is required to attach it to the main run. Looking at the cabinet I don't see how I can move the port. I have the older model Rigid 6" jointer with the sheet metal full cabinet if that helps. Thanks in advance