With a recent install of engineered wood floors both upstairs (nail down) and downstairs (glue down), I'm redoing all of the trim work. I'm finding that the gap between the top of the floor and the bottom of the base is at most 1/2". I'm seeing the largest gaps where I have the longest runs, typically over 16'. With the shoe molding being 3/4" tall, there's not enough room for nailing the shoe molding to the base or at least not without running the risk of splitting the shoe molding. Therefore, my only option appears to be nailing the shoe molding directly to the floor. I realize it's best to allow the floor to expand and contract, although I'm not sure how much of a factor that is with an engineered floor, particularly a glue down.
What options do I have? Any forseeable issues with nailing the shoe molding to the floor?
Thanks in advance,
Brett