I'm getting ready to build some cabinet doors out of red oak. It is kiln dried of unknown moisture content. My shop is 70 degrees and about 55% relative humidity. The doors will be 2" frame and panel with the largest door being 27x18".
I know there's not an exact answer, but how long would you leave the lumber in the shop before fabrication?