I'm about to take the plunge and invest in a basement workshop space. Tee space I have is long and narrow, with a double-door for the walk-out on one end and another door to additional unfinished basement space at the other end. The dimensions are ~42' X ~14' X ~8.5'. I've laid-out the equipment I expect to acquire over time in a first attempt to optimize workflow and minimize duct runs for the dust collection. On the end with the bump-out I expect to install storage and additional countertop working space. I also plan on building a closet for thh Clearvue cyclone. I'd appreciate your feedback. Thanks very much.
Cheers,
Brad