What do these numbers mean?
Well the carving project I posted earlier in the year was completed last night.
For the 3/4 inch strip which was 684 ft long I carved 16 leaves per foot which yielded 10,984 leaves needing to be carved not including the mitered corners.
For the second strip which was 501 ft long I carved 33 leaves per foot which gave 16,533 leaves carved.
All total that was 27,517 leaves over nearly a quarter mile of moulding.
Phew!
I'll be happy not to see this moulding again for some time. But then again if it shows up, I have a good idea what it will take to carve it.
Here are a couple of pics to keep you from having to search the forum.
As you can see I built a vise to hold the two mouldings for ease of carving. I also believe the hydraulic swivel base I had it attached to was simply a life saver.
If you would consider the time had I used my old mechanical screw base and just moving positions several times during the carving of each piece would have added up to quite a few hours devoted over time to just moving the carving.
For example with nearly 1000 pieces of moulding , and moving it 4 times, each requiring say 30 seconds each would total ( if my math is correct) 33 hours of just positioning the work.
In 33 hrs I could have carved a lot of moulding! That's nearly a week of work in itself.