    I'm somewhat embarrassed to ask, because the whole premise behind them is simplicity, but how do you install the bullet dowels? Specifically, I already drilled the holes in the top of my legs to house the 1" oak dowels, and I have the dowels shaped, now, how do I accurately transfer those locations to the workbench top? Is it simply measuring as accurately as possible? I figured they needed to be pretty precise. Any slop would allow your bench top to move under force, and any misalignment would not allow the top to sit down properly.

    Do you flip the bench upside down and use dowel centers? If so, did you rig up a 1" dowel with a 1/2" center (assuming you used a bullet larger than 1/2")? I can't find dowel centers larger than 1/2"?

    Advise appreciated,

    Jeff

  2. #2
    Join Date
    Feb 2014
    Location
    Lake Gaston, Henrico, NC
    Posts
    9,104
    Lipstick......

  3. #3
    Join Date
    Jun 2007
    Location
    Clinton Township, MI, United States
    Posts
    1,554
    Take a piece of one inch dowel and drill a half inch hole in the center, place your dowel center in that hole, the dowel in the one inch hole and mark appropriately.
    From the workshop under the staircase, Clinton Township, MI
    Semper Audere!

  4. #4
    Join Date
    Jul 2007
    Location
    Houston TX
    Posts
    548
    Hah! That's also an old rifle stock inletting trick. Prussian blue in-a-tube works too.

  5. #5
    Join Date
    Aug 2008
    Location
    Portland, OR
    Posts
    528
    I didn't have any dowel centers, so I went a different route. I transferred lines to the face of the leg and the front edge of the top, to give me the alignment along the front of the workbench. I made a drilling jig with a lip that would register on the front of the leg or workbench, which gave me a consistent distance away from the front edge for the holes.

    It still wasn't perfect. But then the pressure of the leg vise clamping has mis-aligned the top from the legs anyway.

  6. #6
    Join Date
    Dec 2010
    Location
    Fort Collins, CO
    Posts
    42
    I thought about marking it (lipstick) but how do you drop the base (or top) down while keeping it aligned?

  7. #7
    Join Date
    Aug 2013
    Location
    Princeton, NJ
    Posts
    7,299
    Blog Entries
    7
    I'd probably just make them go through the base entirely.
    Bumbling forward into the unknown.

  8. #8
    Quote Originally Posted by Jeff Posten View Post
    I thought about marking it (lipstick) but how do you drop the base (or top) down while keeping it aligned?
    I'd do the dowel centers instead of the lipstick.

    Before placing the dowel centers, get the top centered on the base. Now clamp some witness blocks to the underside of the top so you can remove the top and then replace it using those witness blocks to keep it aligned. Remove the top, place the dowel centers, replace top.

    Having a helper that can help you move the top around makes this a lot easier.

  9. #9
    Join Date
    Feb 2014
    Location
    Lake Gaston, Henrico, NC
    Posts
    9,104
    Quote Originally Posted by Jeff Posten View Post
    I thought about marking it (lipstick) but how do you drop the base (or top) down while keeping it aligned?
    Helpers. Not only for handling the top, but pieces of wood clamped to the base to keep proper alignment on the important sides as it's lowered down.

  10. #10
    Join Date
    Dec 2007
    Location
    Fishers, Indiana
    Posts
    554
    I'm not sure how long your dowels are, but If you just install the dowels upside down (so the flat side, not the bullet side is up), then you can just rest the top on top of them and position the top where you want it. Now just get a pencil in between the top of the leg and bench top bottom and draw around the dowels as best you can. Pull the top back off and find the center of the penciled in circles.

    This isn't how I did it on my own bench, but used it to locate the dowels for a concrete top island.

  11. #11
    Join Date
    Dec 2010
    Location
    South Coastal Massachusetts
    Posts
    6,824
    I put a nail into the recess, and clipped off the head,
    just proud of the stretcher.

    I got the top close to where I wanted it aligned,
    using paint stirring sticks.

    Using pry bars, I raised the top enough
    to pull out the paint sticks,
    and lowered it into place.

    The nail point transfers the mark.

    Having done it this way once,
    I just install a bracket inside
    the stretcher legs and drive
    in pocket screws.

    If you're working with a full size
    top (more than 2" thick) it's really a two man job.

  12. #12
    Join Date
    Dec 2010
    Location
    Fort Collins, CO
    Posts
    42
    Thanks everyone for all the ideas. After looking at the logistics with a 4" ash top, I'm leaning towards an alternate method. Trying to decide between bolts through the top, or lag screws from below.

    Thanks again for all the replies,

  13. #13
    Join Date
    Jan 2010
    Location
    Lafayette, Indiana
    Posts
    1,378
    You could make a pattern out of a piece of scrap. Rip something as wide as the bench legs. Make it as long as the bench top width. Use Mike Holden's suggestion for making dowel centers. Mark the centers on your pattern. Then use the pattern to transfer to the bottom of your bench top. You could go ahead and drill the holes in the pattern and make sure it fits to the leg assembly as you want it to, then clamp the pattern to the underside of the bench top and use your new 1" dowel centering tool to mark the wholes for drilling in the bench top. Be sure to mark your pattern so you transfer the front holes to the front of the bench top and the back to the back. You might want a patter for each side of the bench.

    What type of face vise are you going with?

  14. #14
    Join Date
    Jul 2007
    Location
    Houston TX
    Posts
    548
    Jeff, whatever method you use to mount the top, allow for expansion/contraction of the top at the rear. If you use bullet pins, you might also add lag bolts near the front pins, a "belt and suspenders", to prevent top displacement by the face vise.

  15. #15
    Join Date
    Jul 2005
    Location
    Suffolk County, Long Island NY
    Posts
    1,150
    Quote Originally Posted by Jim Matthews View Post
    I put a nail into the recess, and clipped off the head,
    just proud of the stretcher.

    I got the top close to where I wanted it aligned,
    using paint stirring sticks.

    Using pry bars, I raised the top enough
    to pull out the paint sticks,
    and lowered it into place.

    The nail point transfers the mark.

    Having done it this way once,
    I just install a bracket inside
    the stretcher legs and drive
    in pocket screws.

    If you're working with a full size
    top (more than 2" thick) it's really a two man job.
    Hey I like this idea, must remember it...

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •