About a month ago, I sawed some lumber. Needed a place to air dry it, so moved this stack home to the shop lumber storage room. Replaced it with some green lumber. I was heating the shop at the time, weather has improved so I put the dehumidifier to work, and it is still collecting a little water every day. Have no "accurate" moisture tester, so just thought I would ask about how long do you think I should wait before planing this lumber? This stack is about 2 years air dryed, so assume about 12% when I brought it in.