I just received my Dust Gorilla and and getting mixed signals from Oneida on how to hook-up the electrical.
It is a 2HP system that draws 11.5 AMPS. One engineer told me to connect 10 Guage wire to a 15 AMP breaker and another told me to use a double pole 20 AMP breaker.
Does anyone have one that is currently connected. I would appreciate the information.
Thanks,
Bob Dean (new member)