Page 2 of 2 FirstFirst 12
Results 16 to 17 of 17

Thread: Thoughts on Dust Collection Please

  1. #16
    Join Date
    Mar 2003
    Location
    SE PA - Central Bucks County
    Posts
    65,958
    You can also use the hybrid approach which is to do 8" out from the system to the first main branch and then drop to 6" and use the existing duct work. Graduated duct designs were and are common for systems that service multiple tools simultaneously anyway. If you plan for your biggest collection sources to be at the "higher performance end" of the system, that's golden. My setup is like that, although my initial main duct is 7" to match my system's inlet. The J/P has the biggest drop in the whole system just after moving to 6" and doesn't change to 5"/120mm until right at the tool.
    --

    The most expensive tool is the one you buy "cheaply" and often...

  2. #17
    Join Date
    Apr 2013
    Location
    Black Oak Ark.
    Posts
    254
    I wonder about the 55 ft. length . Is it one very long main trunk line ? I know large shops with less ducting than 55 ft. Is the design final ? Can it be tweaked at all ? The G0441 is enough I would guess , 8" mains , 6"branches and drops . Just wondering .

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •