Hey folks, I'm in the process on getting a permit to insulate and finish my garage. I'm currently working on laying out the dust collection. Most of us run the pipe at ceiling height and then drop it down to each tool. However since I'm going to run 4" pipe around only 20 feet of perimeter, I'm wondering if it would be more efficient to run the pipe at mid level on the wall so there is very little vertical lift. It would also declutter the walls as well. I'm going to run the pipe through a super dust deputy and into the blower so mounting the SDD at mid level would make for a shallow dust bin but it would still be workable. And, I don't make enough dust for a small bin to be too annoying.
Talk some sense into me if I'm not taking something into consideration.