New shop in planning so lots of recent questions. Thanks to all who have replied so far.
For my power tool cluster in the middle of planned 38 x 24’ shop is it better to leave a trench in concrete floor, or just pour concrete over dust collection pipe and electric conduit put in place?
The concrete will be covered by some type of wood floor TBD over small sleepers. Want to keep it as soft as possible or for backs and legs.
My early thoughts are trench is better better since I can just cover that with it’s own section of plywood (assuming I don’t go with more traditional maple type floor) and can access to repair or modify in future.
Thx
Jon