So the wife finally agreed to let me take over a 20" x 25" section of the basement. This is a full fledged endeavor as the plan includes; excavation on the exterior for man door / shop access. Current stair situation makes it near impossible to carry full sheet goods in through the house. This is going to hamper my initial tool collection, but the garage is cold and the wife wants her parking spot back.
Long story short....current flooring is set up with the green make shift soccer field. These are 4x4 foam based fatigue type mats, with fuzzy tops.....would you keep or go down to bare concrete or some combinations.