Page 2 of 2 FirstFirst 12
Results 16 to 21 of 21

Thread: Leftovers....again

  1. #16
    Join Date
    Jun 2010
    Location
    twomiles from the "peak of Ohio
    Posts
    12,220
    And a forest of clamps shows up....
    Drawerbuilder 2, forest of clamps.JPG
    Will let this mess sit overnight...and see how it looks in the morning.

    I'm pooped....back is sore, had computer issues trying to process these photos.....

    Stay tuned....
    A Planer? I'm the Planer, and this is what I use

  2. #17
    Join Date
    Jun 2010
    Location
    twomiles from the "peak of Ohio
    Posts
    12,220
    Clamps removed...found an issue..
    Drawer and PIP, plugs made.JPG
    Or, rather 2 issues. Back of the drawer has holes. Had some Rosewood scrap, and made two plugs...
    Drawer and PIP, what holes.JPG
    Problem solved. Front got planed smooth. Ends weren't too hateful..
    Drawer and PIP, ends done.JPG
    Question was whether 2 knobs were too much..
    Drawer and PIP, 2 knobs.JPG
    or just one..
    Drawer and PIP, one knob or.JPG
    Hmmm, decided one will be enough..cordless drill..
    Drawer and PIP, cordless drill.JPG
    Then a dab og glue and a clamp...
    Drawer and PIP, clamp it, Jed.JPG
    Let this sit a bit....then 1st coat of Amber Shellac..
    Drawer and PIP, 1st coat of Shellac.JPG


    Stay tuned...
    A Planer? I'm the Planer, and this is what I use

  3. #18
    Join Date
    Jun 2010
    Location
    twomiles from the "peak of Ohio
    Posts
    12,220
    While waiting....a look around?
    Drawer and PIP, end view.JPG
    The other end of the box...and
    Drawer and PIP, back view.JPG
    Hinge side..and..
    Drawer and PIP, front view.JPG
    A look at the front...have been letting this sit all opened up..
    Drawer and PIP, airing it out.JPG
    Don't want anything to get stuck...now do we...

    Will add a second coat after a bit....Was still a bit sticky..

    Stay tuned..
    A Planer? I'm the Planer, and this is what I use

  4. #19
    Join Date
    Jun 2010
    Location
    twomiles from the "peak of Ohio
    Posts
    12,220
    Have rubbed the box and drawer down a second time, with 0000 steel wool, AND a clean rag....not a real glossy finish...should be good enough to sit around in the shop.

    Film when I can get it processed....

    Stay tuned
    Last edited by steven c newman; 02-12-2022 at 2:36 PM.
    A Planer? I'm the Planer, and this is what I use

  5. #20
    Join Date
    Jun 2010
    Location
    twomiles from the "peak of Ohio
    Posts
    12,220
    Ok..
    Desktop Project Post, front view.JPG
    Front view..
    Desktop Project Post, drawer is open.JPG
    Open the drawer..
    Desktop Project Post, lid opened.JPG
    Open the lid...
    Desktop Project Post, lid closed.JPG
    Top of the lid...
    Desktop Project Post, end details.JPG
    End details..
    Desktop Project Post, underside.JPG
    Underside of the box..
    Desktop Project Post, end view.JPG
    Other end of the box....

    About 2 weeks to do....must be getting slow in me old age...

    Thanks for looking in, from time to time..
    Last edited by steven c newman; 02-12-2022 at 4:39 PM.
    A Planer? I'm the Planer, and this is what I use

  6. #21
    Join Date
    Jun 2010
    Location
    twomiles from the "peak of Ohio
    Posts
    12,220
    Box will be staying in the shop. Once a spot is cleared out for it at the "East End" of the bench.....all the pencils and other small layout tools will be headed there, as well.

    Drawer will hold all the small hardware parts.....and a couple tools to install them with...

    Just have to clean this spot out...
    Messy Bench, bad corner.JPG
    This MIGHT take a while to do....
    A Planer? I'm the Planer, and this is what I use

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •