Results 1 to 10 of 10

Thread: Baseboard finish step up

  1. #1

    Baseboard finish step up

    At the home stretch and saved this piece of baseboard for last while trying to think of how to do step up from one piece of baseboard to another. The tile is on a floated floor. Carpet will be install at the lower elevation. The change in elevation is 3/4". Any ideas? What does it look like and how do I cut it? I have a many types of saws including miter saw. (when I previewed the picture it was vertical, not sure why)
    Attached Images Attached Images
    Last edited by Hillary Marks; 10-14-2023 at 7:52 PM.

  2. #2
    Join Date
    Jun 2012
    Location
    New Westminster BC
    Posts
    3,043
    How about adding a corner block?

  3. #3
    Quote Originally Posted by Doug Garson View Post
    How about adding a corner block?


    YES! Thank you for responding. I'm making a jig to try that. I'm also going to try this and see what looks best. This was suggested in another group. baseboard.jpg

  4. #4
    Depending on what the taller piece is running to I would consider just ripping it 3/4" shorter. Like if it terminates in a doorframe or corner where it doesn't have to meet another piece that would make it noticeable.

  5. #5
    The best way is rip off or add to the shorter run to match up at the corner.

  6. #6
    Join Date
    Jan 2009
    Location
    Indianapolis
    Posts
    1,641
    Not a criticism. If you install baseboard before your flooring, then run the flooring up to it with a gap and cover this with quarter round. When you replace either flooring in the future, and you will, you will have to remove all the baseboard as part of the job. Brian
    Brian

  7. #7
    Quote Originally Posted by Jim McCue View Post
    Depending on what the taller piece is running to I would consider just ripping it 3/4" shorter. Like if it terminates in a doorframe or corner where it doesn't have to meet another piece that would make it noticeable.
    This is how we do it. Alternatively, on occasion we have had to add a piece to the bottom of the shorter piece because it was less noticeable than ripping the taller piece.
    - Mike

  8. #8
    Join Date
    Mar 2003
    Location
    SE PA - Central Bucks County
    Posts
    65,976
    I'd absolutely use corner blocks for this kind of step situation.
    --

    The most expensive tool is the one you buy "cheaply" and often...

  9. #9
    Join Date
    Feb 2003
    Location
    McKean, PA
    Posts
    15,676
    Blog Entries
    1
    Even if you adjust the base molding you will still have a significant change of height between the top of the carpet to the tile. What about raising the floor in the carpeted area with some 3/4" sheets of plywood.
    Lee Schierer
    USNA '71
    Go Navy!

    My advice, comments and suggestions are free, but it costs money to run the site. If you found something of value here please give a little something back by becoming a contributor! Please Contribute

  10. #10
    Quote Originally Posted by Brian Runau View Post
    Not a criticism. If you install baseboard before your flooring, then run the flooring up to it with a gap and cover this with quarter round. When you replace either flooring in the future, and you will, you will have to remove all the baseboard as part of the job. Brian
    Carpet is going in this room. It's about 1/4" above the floor.

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •