Ok, while this won't be my primary woodworking shop it will be a place to store lumber, plywood and panel saw, and maybe even a large sander one day.
The foundation was completed a few weeks ago. The framers were consideralby impressed it was only out of square by 1/8". I have to give that to the foundation guy I hired. He is the best in the area that I know, has been around for a ong time. We tweaked the plans a bit to raise the side walls of the foundation. This gives me more headroom. However since there is a second floor to this garage, We had to put in a landing to keep the stair run the same.
IMG_1006a.jpg
In this picture you can see the proximity of the garage to the house.
IMG_1005a.jpg
Now on Wednesday the Lumber Package arrived.
IMG_1000a.jpg
On Thursday The Trusses arrived. I had the truss company tweak the plans a bit. The stick framed version of the upstairs was only 14 ft wide, I was able to push it out to 16 ft. More floor space!
IMG_1008a.jpg
Day 2 of the framing. All of the walls have been framed. The trusses are being prepped for the gable ends, and the doubles nailed together.
IMG_1009a.jpg