Results 1 to 8 of 8

Thread: Above Ground Pools

  1. #1
    Join Date
    Dec 2006
    Location
    Kanasas City, MO
    Posts
    1,787

    Above Ground Pools

    Anyone here adventurous enough to have assembled an above ground pool or broken one down for a move and reassembled it?
    In my quest to do everything my darn self, I am putting together info for buying an above ground pool in the rather near future. Life seems predicated to keep me in the Mid West awhile longer... and summers here will be more tolerable with a pool in the back yard....
    Maybe I am trying to be too cheap here and should just buy a turn key package... but this place is about the only idea I had for advise on this subject. The sales guys tell me I am nuts, but they are selling their services as much as the hard goods IMO. I have a friend less than 2 blocks away who has a bobcat to make the heavy work no so heavy.....
    Anyone with any experience, please chime in. If I should buck up and have them do it, tell me (that way the LOML isn't the only one who thinks I am NUTS and don't have to do everything on my own!).

    Thanks,
    Greg

  2. #2
    Join Date
    Dec 2003
    Location
    Putnam County, NY
    Posts
    3,086
    My brother got an above ground pool for free. The deal was you take it down and away and you can have it. We put it together with some of his friends and it really wasn't bad. He has been using it for many years now with no problem.
    We did the leveling of the site with shovels and a transit.
    It was suggested by a pool supplier that he not try to reuse the liner that he got with it. "You'll never get it to fit right." was what they said but he tried it and it worked. He made a point of keeping it wet. It really isn't rocket science.
    That said 13 years later and with a back that is not doing too well I might opt for the company to do it.
    I could cry for the time I've wasted, but thats a waste of time and tears.

  3. #3
    Join Date
    Mar 2005
    Location
    Anaheim, California
    Posts
    6,914
    Not that big a deal, really:
    Redneck1.jpg
    Yoga class makes me feel like a total stud, mostly because I'm about as flexible as a 2x4.
    "Design"? Possibly. "Intelligent"? Sure doesn't look like it from this angle.
    We used to be hunter gatherers. Now we're shopper borrowers.
    The three most important words in the English language: "Front Towards Enemy".
    The world makes a lot more sense when you remember that Butthead was the smart one.
    You can never be too rich, too thin, or have too much ammo.

  4. #4
    Join Date
    May 2007
    Location
    Howard, PA
    Posts
    31
    We got an above-ground a while back. Went and picked it up in our pickup, set it up over the following few-days. Like John said, brother-in-law and I levelled the site ourselves with a transit and shovels, oh, and a skid-steer - gotta have power equipment for the entertainment.
    When I was done with it (read: tired of buying chemicals) we took it apart and set it up at my brother-in-law's house. He got a new liner though.
    Other than that spend some time getting the site prepped right and it really isn't a big deal, just follow the directions. Now if it were in-ground, different story.

    Good luck,
    Scott

  5. #5
    Join Date
    Jul 2005
    Location
    Sammamish, WA
    Posts
    7,630
    There are differences in size, this sounds like a big one. When we lived in CA
    I put up one that was small, 3' deep and 12' diameter, and moved it a few years later when we moved. It was fine another several years until a bad rainstorm caused water to build up on the cover and the additional weight bent the metal supports and it collapsed.

    I wish I had one today, it's supposed to be 93 and then 100 tomorrow. I don't think the goldfish would like to share their pond with me.



    Sammamish, WA

    Epilog Legend 24TT 45W, had a sign business for 17 years, now just doing laser work on the side.

    "One only needs two tools in life: WD-40 to make things go, and duct tape to make them stop." G. Weilacher

    "The handyman's secret weapon - Duct Tape" R. Green

  6. #6
    Join Date
    Dec 2006
    Location
    Kanasas City, MO
    Posts
    1,787
    Hey Lee,
    Tried that one in highschool... but add in a few more bodies and some "canned refreshments".
    Was great fun and we managed to get a few "loops" in the good old home town before the blue lights dropped my tailgate and ripped the "liner".
    All in the name of a good time, but I can't imagine trying that in this day and age (then again this was "ONLY" 12 years ago)
    When the pool idea didn't go over, we opted to make the pool site a moving patio... until we determined sitting in lawn chairs in a moving truck bed was inherently more dangerous than sitting in a "pool". Aluminum lawn chairs & a steel bed.... and maybe an exaggerated corner or 2.
    On a serious note...Thanks for the input from you who chimed in, but that didn't make the decision any easier... it's almost tempting.

    Greg

  7. #7
    Join Date
    Mar 2004
    Location
    Vermont
    Posts
    2,296
    I'm thinking you can do it. But I am not sure you should. Install will cost you about $500-$1000. For that you will get 2-3 guys working for one entire day. They will level the ground and bring in sand, that took my pool guys most of one morning to do. Then they set the pool in place and assembled the structure...this was in place by around 3pm. They then messed with the liner for about two hours and were "just" adding water too the pool around 5 when I came home. By 7pm they were packing it up with plans to return in the morning to meet the firetruck pumpers "just in case" anything went wrong during the fill. I had contacts with the fire chief and got him to come out that night with water to get it about half full to save the pool guys a trip back in the morning. We all had a few beers while 30 trips were made to fill it.

    If i had to do it over again seeing it done , I would pay again to have it installed. You are going to pony up 3 grand for a pool...i would go the extra mile to have it installed by a professional. (with references)

  8. #8
    Join Date
    Feb 2006
    Location
    Southern Ontario Canada
    Posts
    430
    I did it about 25 years ago, the hardest part was leveling the ground other than that it went pretty well. Did most of the work myself. Today I would pay to have it done.
    Rick
    I support the Pens for Canadian Peacekeepers project

Similar Threads

  1. sub panels
    By Cliff Rohrabacher in forum Off Topic Forum
    Replies: 5
    Last Post: 05-09-2007, 1:30 PM
  2. Physiological Effects of Electricity...
    By Dave Richards in forum Off Topic Forum
    Replies: 15
    Last Post: 09-19-2006, 11:21 AM
  3. Ground symbol
    By Jeff Chumbley in forum Laser Engraving General Topics
    Replies: 5
    Last Post: 09-18-2006, 2:40 PM
  4. Sodding hard ground
    By Mark Cothren in forum Off Topic Forum
    Replies: 9
    Last Post: 03-15-2006, 12:32 AM
  5. OT Ground squriels
    By Steve Roxberg in forum General Woodworking and Power Tools
    Replies: 1
    Last Post: 10-11-2003, 11:09 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •