Results 1 to 4 of 4

Thread: Shop Progress, Week 5

  1. #1
    Join Date
    Mar 2003
    Location
    Monroe, MI
    Posts
    11,896

    Shop Progress, Week 5

    It's been about 5 weeks since I started finishing the inside of the pole barn at our new house. Last week I had the flu and didn't make much progress, but this week was better. I now have heat, thanks to the propane company who installed my tank on Friday. Earlier in the week, I finished wiring the lighting.

    Saturday two of my brothers helped move everything out of storage and into the barn. It took 1 trip with a 24' truck and two trips with my 5x8 utility trailer to move everything.

    Tonight, I started getting organized and started to install the dust collection system.

    The three pictures below are overall shots.
    Attached Images Attached Images

  2. #2
    Join Date
    Mar 2003
    Location
    Monroe, MI
    Posts
    11,896
    Next, a shot of my lumber rack loaded, and the rack I put up to hold pieces of pipe, aluminum, etc.
    Attached Images Attached Images

  3. #3
    Join Date
    Mar 2003
    Location
    Monroe, MI
    Posts
    11,896
    Cyclone mounted and blower positioned. Still need to bolt the blower down and then start on the ducting. I need to get the ducting up soon so I can return the scaffolding.
    Attached Images Attached Images

  4. #4
    Join Date
    Feb 2003
    Location
    Broken Arrow(Tulsa), OK
    Posts
    812

    Thumbs up

    Matt,

    Looks like you're going great guns. You oughta be making sawdust before too long!

    Bob

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •