well here is my first draft of the basement shop upgrade/move.
let me know your thoughts of the plan. the tool placement isn't perfect to the inch but it is pretty much what i plan on. the ceilings are LOW (about 6'8") plywood and poured concrete walls, open joist above, alot of florecent "wrap around" lights. walls painted light color, i am considering taking a paint srayer from work to do the open joist but i dont know it is worth the time. Ideas??
as for how i work, i do not use sheetgoods very often and anyways i would need to break them down before they make it into the shop anyways...
most of my work is solid furniture, smaller stuff, coffee tables, end tables, soon to have some dressers, beds and dining tables (maybe matching chairs) produced from the shop.
the tools shown are: PM 66, Craftsman 10" TS, PFMX 16-32, 14" bandsaw, 6" jointer, 12 CMS, 16" planer,12" DP. i also have JET 1100RC DC not show.
let me know what you guys think about my layout. tear it all up so i have something to do tomorrow night after work!! thanks for your input!
Nick