Not sure if this is appropriate forum. But, I need to move a shower drain line in a concrete slab. I have read that the p trap should be left in a dap out. This dap out appears to be a boxed opening left in the concrete and then houses trap plumbing. I'm unclear as to whether this void would then be filled with concrete to provide a solid surface and seal the slab back up? It seams this would be the case as it would be a moisture barrier as well as for gases(ie radon). Anyone have experience in this?
Thanks
Bill