Results 1 to 4 of 4

Thread: DC install about done, finally.

  1. #1
    Join Date
    Mar 2003
    Location
    Upland CA
    Posts
    5,567

    DC install about done, finally.

    Well, it's been only 10 weeks since I got my spiral ducting, and I am about to finish the final drops tonight. Only got a few hours at a time to work on it, and I am pretty slow to start with, so it took a while. I am jealous of some who said they got theirs in over a weekend.

    I ended up with the 3HP super gorilla hooked to twelve 6" gates, and four 4" gates, although some of the 6" gates have reducers to 4" for now, right at the end, with just 4' or so of 4" hose. These go to bandsaws, small sanders etc., until I decide if they need to be bigger.

    The 6" hose goes to the drum sander, two table saws, jointer and planer.

    I still have to make adaptors for the tools with new 6" lines. Probably take me a while to figure that out.

    In my old shop, I had a single drop going to several machines which I clustered together. I just switched the hose to the proper machine using one of those bell mouthed adaptors. For example, the hookups for the table saw, jointer, floor sweep, and saw mounted router table were all within a foot of each other in a sort of manifold. I could switch the hose to the desired machine in about 5 seconds.

    I plan to do the same with the new 6" hose, just have to decide and design it first. I will post a tip on this later today.

    Rick Potter

    PS: I got a great deal on my spiral pipe and there is some left. I can return it, but if anyone local needs it, see the classifieds. Sorry if I am not supposed to say that. If there is a problem, dump it.

  2. #2
    Join Date
    Nov 2006
    Location
    Fallbrook, California
    Posts
    3,562
    Rick, that sounds great. I hope that you plan to post some pictures after you're done.
    Don Bullock
    Woebgon Bassets
    AKC Championss

    The man who makes no mistakes does not usually make anything.
    -- Edward John Phelps

  3. #3
    Join Date
    Oct 2006
    Location
    Bloomington, IL
    Posts
    6,009
    What size main line did you run?

  4. #4
    Join Date
    Mar 2003
    Location
    Upland CA
    Posts
    5,567
    Mike,

    The main line is 8" for about 20', then it breaks down into 6" for everything else. Six inch gates, some of which have 4" reducers, at least for now, depending on what machine it serves. There are three 4" wyes, coming off the 6". One is for a overblade guard I will someday build. Another is for the top pickup on the RAS. The third is just there because it looked like it might be handy some day.

    I have some blast gates I may never use, but I didn't want to take the system apart if I move machines.

    Rick Potter

Similar Threads

  1. cooled humidor finally done
    By sascha gast in forum General Woodworking and Power Tools
    Replies: 9
    Last Post: 06-24-2008, 12:14 PM
  2. Long overdue shop organization FINALLY started
    By Grant Davis in forum WorkShops
    Replies: 3
    Last Post: 03-21-2008, 1:33 AM
  3. Stairs are Finally Done
    By Mike Murray in forum General Woodworking and Power Tools
    Replies: 16
    Last Post: 04-24-2007, 5:24 PM
  4. New Dust Gorilla Install
    By Jeff Bradley in forum General Woodworking and Power Tools
    Replies: 11
    Last Post: 12-30-2005, 1:37 PM
  5. Finally got some time in the shop
    By Matt Meiser in forum General Woodworking and Power Tools
    Replies: 1
    Last Post: 12-19-2004, 11:03 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •