I'm having carpeting installed on my concrete basement floor. I'm doing the trim myself. My question is, should I install the baseboard moulding first before the carpet is put down? If so, do I leave any space between the floor and the moulding and put the moulding directly onto the floor? would this be also true for the door trim-ie the gap versus no gap between the floor.
Thanks,
Darren