This project had a few starts & stops......life happens......but it was finally completed back in late September (I think). We hired a general contractor for most of the work and I have 'sweat equity' in most all the parts. I learned a lot about tile work / Trim / prefinished flooring, etc..
Anyway - one used to walk thru the master bedroom to get to the bathroom and all the closets, etc. The entire space was nearly 'gutted' and a new layout evolved. We added a new Laundry room (very convienient now) and upgraded most everything. The Wenge vanities use prefinished maple ply components and have a Limestone top. The tub is jacuzzi and stainless steel. All the flooring is heated. The new walk-in closet was our 'old bathroom'.
My beautiful wife designed everything -- and she is very pleased. The wenge vanity has lots of storage. Soft close drawer glides for all.
Several of you had asked about this project and I apologize letting this get so tardy - me bad! Special thanks to Larry Fox for his assistance and I'd have to say that Mark Singer has 'influenced' our style a bit towards the west coast......
Here are the pics: