Thanks Ian. I’ve been on and off working on this one for about 5 months. The first one I built took about a year, ive gotten mor3 done on the new one with more quarantine time in shop.
Meranti side panels are 1/4”, bottom hull is 1/2” and decking is 3/8”.
LOA is 16’9”.
The lines I “changed”, means I modified many of the stations from a classic Briggs dory, to enlarge some spaces and make other smaller. Also made some changes to both the sheer and chines.
A few pictures from later parts of the build, including hatch work, adjustable footrest, bronze casting and gunwales, casting bronze, and maiden voyage on the Green River.