Results 1 to 13 of 13

Thread: Study Progress

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Join Date
    Feb 2003
    Location
    Chappell Hill, Texas
    Posts
    4,741

    Study Progress

    Here are a couple shots I took this afternoon of the big study job I'm working on.

    The bookcases are set in place, lighting has been added, and are waiting on face frames.

    The addition of ceiling beams is complete - sans one last moulding that will wrap the entire perimeter where the bordering beam meets the sheetrock. The ligher colored carved egg & dart moulding is poplar that will be stained to match the rest of the cherry.

    I'll have the block paneling up by Monday at the lastest. More pictures then.

    Thanks for looking! Todd
    Attached Images Attached Images

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •