-
Around here, it is fairly common to run UF-B cable in conduit as long as the fill requirements for the conduit aren't exceeded. The requirement is the same as for NM-B. The inspectors strictly enforce the requirement to bury the conduit and wiring at least 24 inches. As Julie says, it is essential you check with your electrical inspector ahead of time if you are going to have the installation inspected.
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules