Got a portion of the side of my backyard that I need filled in. It's got a slope of I would say 45 to 60 Degrees, that slopes down to the wood fence. From the bottom of the fence to the top of the slope, I would estimate about 4 feet down. It's about 7 to 8 feet wide. and runs 15 to 20 feet in length.
Now , I could get dirt fill, but that is a lot of dirt fill . Neighbor is a tree trimmer , and gets 20 ton dump truck loads in all the time. I was thinking of getting a few of these loads , spread the mulch out where I need it filled in, and then get a load of dirt fill to spread over top the mulch. Then put grass seed on top of it.
Does this sound like a good idea, or is there a better way ?