Hello,
I framed an office into my garage and I need to trim out this concrete ledge you can see in the pictures. The rise is about 3.5" and the ledge itself is about 2-3" out from the wall. I was thinking about simply a 1x4 up and then a 1x3 capping it (finished). Then I was debating about a baseboard on top of that or simply leaving the ledge wrapped in finished wood. Any thoughts? Other ideas?
Thank you for the help and advice.
Trim (2).jpgTrim (1).jpgTrim (3).jpg